Bespoke New Build Waterproofing System

We are now in the final phase of completing a structural waterproofing system (BS8102 compliant) to this impressive grand designs built dwelling, water resistant concrete was used to form the shell and floor of the structure, complete with a cavity drainage system internally.

Serviceable wall floor drainage channels have been installed that discharge into a pumping station, complete with a large capacity drainage membrane to the floors, drainage veins have also been installed within the surface of the concrete floor, following a water flood test, this will ensure that any free ground water entry will find its way into the pumping station for evacuation, the concrete floor has also been sealed to prevent free lime leaching.